Usage Metering & Billing Pipeline · View 19 of 22 · Operations
Decisions
- A period is provisional from the moment it opens and stays that way until the lateness bound elapses. Provisional is a state, not a caveat in the UI.
- An issued period re-enters the ring only by authorised restatement, and that produces a second figure rather than reopening the first. The ring therefore has no backward arrow, which is deliberate.
- The gate between draft and issue is a human one. Everything before it is automatic and everything after it is immutable.
Assumptions
- Monthly cycles with per-account anchor days (stated assumption), so the close load is spread across the month rather than falling entirely on the first.
- 72-hour grace before close (stated assumption), which is the same lateness bound the aggregator enforces.
Risks
- The transition from provisional to closed is where the biggest figure change happens, and it is invisible to the customer unless the delta is published.
- A period that cannot close because a partition is stalled blocks an invoice run. The failure is operational but the symptom is commercial.