The outside contributor and the auditor are in the cast. A platform designed only for the engineer who works here gets the fork case wrong and the evidence case late.
The scheduled trigger is an actor with a goal — use the capacity nobody wants, and get out of the way when a human is waiting — which is the whole justification for priority tiers.
The platform engineer's goal names the fairness problem: 40,000 slots busy without one monorepo starving everyone else.
Three journeys get their own map
The engineer's green check — the loop that decides whether the platform is used at all.
The fork contribution — the case where safety and welcome pull in opposite directions.
The release promotion — the case where the evidence chain either holds or does not.
Assumptions
14 platform engineers for 610 tenants; 18,000 scheduled runs a night; two audit reviews a year.