Term Kind Topic What it is
Capacity Headroom concept Capacity Planning The deliberate gap between current load and maximum capacity, sized to absorb growth, spikes and the loss of a failure domain.
Reliability Headroom metric Capacity Planning The gap between provisioned capacity and the load that would be carried after the largest planned failure, measured under peak conditions.