Term Kind Topic What it is
Peak Event Readiness practice Peak Event Readiness Preparing for a known, dated, high-stakes traffic event — where the discipline is as much organisational as technical.
Peak Readiness Rehearsal Pre-Event Verification, Scheduled Peak Drill practice Peak Event Readiness The set of pre-peak actions and verifications - warm caches, warm pools, confirmed dependency headroom, a change freeze, a rehearsed shedding path - without which correct capacity still fails.
Pre-Scaling Scheduled Scaling, Warm Provisioning, Capacity Staging practice Peak Event Readiness Provisioning capacity in advance of a known event rather than relying on autoscaling, because the arrival spike at a scheduled moment is faster than any reactive control loop can respond to.
Retail Peak: Designing for Black Friday Black Friday Readiness case-study Peak Event Readiness A retailer's annual peak can be an order of magnitude above normal, arrives in minutes, and cannot be rescheduled — which makes it a distinct engineering discipline.