Term Kind Topic What it is
Trough-Based Commitment Baseline Reservation, Commit to the Floor practice Reserved & Committed Capacity Sizing reserved capacity to the quietest period rather than the average, because only the trough is capacity you are certain to use for the whole commitment term.
Unit Economics metric Unit Economics Infrastructure cost expressed per unit of business value delivered, which reveals efficiency trends that absolute spend cannot.
Unit Economics of a System metric Unit Economics The cost to serve one unit of business value — a customer, an order, a request — which determines whether a system's economics improve or worsen with scale.
Utilisation Floor metric Rightsizing The minimum utilisation a resource should sustain before it is considered over-provisioned, set with enough margin for failure and peak.
Waste Elimination Zero-Reliability-Cost Reduction, Cloud Hygiene, Orphan Cleanup practice Waste Elimination Removing spend that buys nothing - orphaned resources, oversized instances, idle environments, over-retention - which is typically a substantial fraction of an unmanaged estate and costs no reliability whatsoever.
Waste Elimination practice Waste Elimination Removing spend that produces no value at all — the least controversial and most consistently available saving.