Quiz
2667 questions of the kind that actually get asked — in interviews, in architecture review boards, and by the person who has to run the thing at 3 AM. Every answer states the trade-off rather than the slogan, and says when the obvious choice is the wrong one.
All areas2667
Architecture Fundamentals81
Distributed Systems101
Data Architecture90
Cloud Architecture87
Networking86
API & Integration Architecture78
Reliability & Resilience88
Observability81
Performance & Capacity Engineering90
Security Architecture95
Cost Architecture & FinOps92
Business Architecture93
Architecture Communication91
Enterprise Architecture91
Legacy Modernization92
AI-Era Architecture86
Software Architecture & Engineering84
Architecture Patterns84
Architecture Decision-Making91
The Architect's Meta-Skills92
Delivery & Release Engineering93
Platform Engineering & Developer Experience92
Testing & Quality Architecture90
Data Platform Architecture88
Streaming & Real-Time Data93
Data Governance & Semantics81
Frontend & Experience Architecture91
Edge, Mobile & IoT88
Regulatory & Data Protection Architecture90
Assurance, Audit & Model Risk88
92 questions in Legacy Modernization.
-
Strangler Fig advanced
A legacy scheduling system must be replaced incrementally. How should a strangler approach, traffic shadowing, dual-run comparison and rollback be sequenced, and what reconciliation is required?
3 min answer stranglershadow-trafficdual-runreconciliation -
Strangler Fig advanced
A strangler migration is 70% complete and has stalled. The legacy system still runs. What happened and what do you do?
2 min answer modernizationprogrammedecommissioning -
Strangler Fig advanced
A wallet platform must migrate from a monolith to services while serving live traffic. What sequence minimises risk, and which step is usually done in the wrong order?
2 min answer mobikwikstranglermigrationsequencing -
Strangler Fig advanced
You are modernising a fifteen-year-old monolith with the strangler pattern. Which slice do you extract first, and why?
2 min answer modernizationstranglermigrationsequencing -
Zero-Downtime Migration intermediate Multiple choice
A commerce platform must change a database schema while an older application version is still running. What migration pattern prevents downtime, and what is the common mistake?
2 min answer myntraschema-migrationexpand-contractdeployment -
Zero-Downtime Migration advanced Multiple choice
A hot table needs a column renamed and retyped, across many running instances. What constraint dictates the whole sequence?
2 min answer expand-contractrolling-deploymentreversibilityverification -
Zero-Downtime Migration advanced
A large sharded MySQL fleet needs a tenant moved between shards with no downtime. How should online data movement, dual writes, cutover and rollback be sequenced?
2 min answer vitessplanetscaleshardingmigration -
Zero-Downtime Migration advanced
A platform deploying many times a day must change a column type on a very large table with no maintenance window. Walk through the sequence.
2 min answer zero-downtimeexpand-contractbackfillschema