Term Kind Topic What it is
Bin-Packing Efficiency Packing Density, Requested-to-Allocatable Ratio metric Rightsizing The share of purchased node capacity that scheduled workloads have actually reserved, which is the missing link between a rightsizing campaign and the invoice it was supposed to reduce.
Commitment Coverage metric Reserved & Committed Capacity The proportion of steady-state usage covered by discounted commitments, balanced against the risk of committing to capacity that is no longer needed.
Cost of Downtime metric Cost vs Reliability The quantified business impact of unavailability per unit of time, which converts reliability investment from an argument into an arithmetic comparison.
Cost per Request metric Cost per Request Total cost divided by units of business value — the metric that makes cost comparable across time, scale and design options.
Cost per Request metric Cost & FinOps The fully-loaded infrastructure cost of serving one request, and the unit that makes architectural cost decisions comparable.
Funnel-Stage Cost Ratio Attempts per Conversion Cost, Pre-Conversion Cost Multiple metric Unit Economics The cost incurred by all the attempts that precede one revenue event, expressed per revenue event, which exposes the case where making each attempt cheaper makes the business more expensive.
Telemetry Spend Ratio metric Observability Cost Observability cost as a proportion of the infrastructure it observes, used as a tripwire for a category that grows silently.
Total Cost of Ownership TCO metric Cost & FinOps The full lifetime cost of a capability, including the people, operations, upgrades and exit that a licence comparison leaves out.
Unit Economics metric Unit Economics Infrastructure cost expressed per unit of business value delivered, which reveals efficiency trends that absolute spend cannot.
Unit Economics of a System metric Unit Economics The cost to serve one unit of business value — a customer, an order, a request — which determines whether a system's economics improve or worsen with scale.
Utilisation Floor metric Rightsizing The minimum utilisation a resource should sustain before it is considered over-provisioned, set with enough margin for failure and peak.