Term Kind Topic What it is
Break-Glass Change Ratio Emergency Change Rate, Bypass Ratio metric Change Advisory vs Automated Gates The share of production changes that took the emergency path instead of the gated one, which measures how much of the change population a control actually covers.
Change Risk Budget Material Incident Budget, Change Risk Allowance metric Risk Appetite A stated ceiling on material customer-visible incidents per period, converted into the change failure rate and escape rate engineering must design for - a conversion that usually shows blast radius and revert …
Evaluation Gate Coverage Gate Scope Ratio, Release Evaluation Coverage metric Model Evaluation & Red-Teaming The share of a feature's real failure surface that its release evaluation actually exercises, which determines whether a passed gate is evidence of safety or evidence that the suite is stale.
Reviewer Throughput Ceiling Oversight Capacity Limit, Review Time Budget metric Human-in-the-Loop Design The number of items a human reviewer can genuinely assess per hour, which bounds what any human-in-the-loop control can actually deliver regardless of what the design document claims.
Sampling Risk Detection Probability, Audit Sampling Power metric Continuous Controls Monitoring The probability that a sample-based control test misses a violation that exists in the population - which for small samples and rare violations is most of the time.