intermediate 2 min answer

Finance wants a three-year commitment on cloud spend for the discount. Engineering is nervous. How do you advise?

finopscommitmentcostrisk
Show the full answer Hide the answer

Commit to the floor, not to the forecast

The safe commitment is the portion of usage that will exist regardless of what happens: the steady baseline, evidenced by twelve months of actual consumption at its lowest sustained level. Everything above that is served on demand or by spot capacity.

Committing to the forecast is where organisations get hurt, because the forecast includes growth that may not arrive and workloads that may be re-architected.

Ask what would invalidate the commitment

Three questions, and engineering's nervousness is usually one of them:

Is a migration or re-architecture planned? Moving to a different compute model, adopting a managed service, or a significant efficiency programme all reduce the committed shape. Committing before a planned change means paying for capacity you deliberately stopped using.

Is the workload's shape stable? A commitment tied to a specific instance family is riskier than a flexible spend commitment, and the flexibility is usually worth the smaller discount.

What is the business risk? A three-year commitment on a product line under strategic review is a different proposition from one on core infrastructure.

The structure that usually works

A layered approach: a three-year commitment on the genuinely permanent floor, a one-year commitment on the next layer, on-demand and spot above that. It captures most of the discount while keeping most of the flexibility.

Prefer flexible commitments over instance-specific ones unless the discount gap is large.

What to say to both parties

To finance: the discount is real and so is the risk of committing to capacity we plan to stop using. Here is the evidenced floor and what we can safely commit to.

To engineering: a commitment on the baseline does not constrain design — it is a billing arrangement on capacity that exists either way. What it does constrain is deliberately reducing that baseline within the term, so any planned efficiency programme needs to be on the table before signing.